View Single Post
Old 04-19-2008, 08:45 PM   #2
Mr Lefty
TWFix Legend
 
Mr Lefty's Avatar
 
Join Date: Feb 2008
Location: Denver CO
Moto: 01 BMW F650GS Dakar
Posts: 15,677
Default

Quote:
Originally Posted by Cutty72 View Post
and ride
and new signals... but those will take 30secs with the fairings already off...

I really think this will take 1 day AT MOST... I'll soak the chain and sprocket in Kero. first... let it soak till the last thing... cut the fairings while draining the oil...

I think I'll flush the coolant while I'm at it... I need to put a new overflow bottle on as it's required for the sliders... and I'll put some water wetter in.

and most fucking defiantly ride!
Mr Lefty is offline   Reply With Quote