Quote:
Originally Posted by Cutty72
and ride
|
and new signals... but those will take 30secs with the fairings already off...
I really think this will take 1 day AT MOST... I'll soak the chain and sprocket in Kero. first... let it soak till the last thing... cut the fairings while draining the oil...
I think I'll flush the coolant while I'm at it... I need to put a new overflow bottle on as it's required for the sliders... and I'll put some water wetter in.
and most fucking defiantly ride!