I put in 60 hours this week welding on this extremely large stainless steel weldment. Plenty of TIG welding and also some MIG welding too.
![]() This is half of the main body. It's 30' long, about 7' deep and just over 8' high. ![]() Out of focus picture of the inside. ![]() The auger body, three augers with the drive system will weigh over 20,000 lbs fully assembled. ![]() This will hold three large augers to remove the processed material from the tank. ![]() Where the product comes out of the auger. It's 25" wide and 100" long. ![]() This will bolt up to one end of the auger and along with a heavy steel motor mount ( made of four I beams with 1/2" plate on the top), hold the three motors with speed reducers that will drive the augers. ![]() ![]() Those stainless steel augers are 36' long and weigh over 3500 lbs each. Jeff previously a machinist, now a welder again for another month or so |
![]() |
![]() |