![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
#11 |
Designated Drinker
Join Date: Jul 2008
Location: shitville
Moto: 2009 ZX6R
Posts: 1,661
|
![]()
A couple of pics in the sun. Exhaust is back on. Electrical box installed. Still have some wiring to clean up. Battery box in place. Just ordered my new chain today. Scored a skatebaord wheel from the local shop to turn into my chain roller.
![]() ![]() Checklist of things left to do... Chain roller Hook up all electrical Build tail light/tag bracket Wire up tail light Get chain on Strip/clean tank. Bondo where the badges were. Paint tank Carbs and filters back on Mount a pivot for rear brake lever Clutch needs adjusting Paint handlebars Install grips Order tires Paint wheels/mount tires It seems like there are a million small tasks on this project. I'm really enjoying it, though.
__________________
![]() |
![]() |
![]() |
Bookmarks |
|
|