Go Back   Two Wheel Fix > Riding > Street

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-06-2008, 11:49 PM   #1
t-homo
WSB Champion
 
Join Date: Feb 2008
Location: Springfield, MO
Posts: 7,146
Default New Bike Day...#2

Just put a down payment on a 2000 R1. It has a full Hindle exhaust system, Stage 3 jet kit, K&N air filter, brembo brake lines, and a -2 sprocket in the back. -2 because he wanted to tame it down some in the low end. Paint job done by him because he liked Rossi's YZR M1 so much, but wanted red. He does car body work on the side, adn when I got there he was working on a lexus. Only downfall is that is currently has 42K miles on it. I gave him 300 today to hold until next tuesday when my dad and I can pick it up. I rode it about 4 blocks, and it felt very smooth and controlable, but like anytime I wanted to, I could throw the front end up in the air. Seating position was pretty comfortable for what it is.

I snapped some pictures before I left.





Last edited by t-homo; 05-06-2008 at 11:57 PM..
t-homo is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:07 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.